Your bridge to the most competitive resources of HVAC&R in China.

+86 20 31149172 info@tofee.com.cn

Manual Refrigeration Oil Charging Pump

 

ModelR1R2
Max Pump To Against Pressure10bar (145psi)15bar (218psi)
Max Pump Rate Per Stoke50ml75ml
Applicable Oil Bottle SizeAll Size
Hose Connect1/4" SAE1/4"&3/8" SAE
Outlet hose1.5m Oil Hose1.5ml HP Hose

 

  • PRODUCT DETAIL
  • Download
  • SHIPPING
  • PAYMENT
Applications

The high pressure manual refrigeration oil pump provides for the addition or removal of refrigeration oil when servicing air conditioning and refrigeration systems. The pump can be used while the unit is operating. It is not necessary to shut down the system for charging. Fitting and transfer hose included. Use with all oils.

Features
▲ Piston-style hand pump
▲ 10 full strokes will pump 1 pint of oil
▲ Threaded collar slides to accommodate cans of varying height
▲ Equipped with adapter rings to fit a wide variety of containers
▲ Comes with plastic hose for insertion into compressor crankcase
▲ With pressure oil charging, applicable to all oil products
▲ Using stainless steel materials, reliable and durable
▲ Special design, ensure to connect the different size of oil containers.
▲ Backflow prevented structure, ensure filling safety.

 

Technical Data

ModelR1R2
Max Pump To Against Pressure10bar (145psi)15bar (218psi)
Max Pump Rate Per Stoke50ml75ml
Applicable Oil Bottle SizeAll Size
Hose Connect1/4″ SAE1/4″&3/8″ SAE
Outlet hose1.5m Oil Hose1.5ml HP Hose

 

Detailed Images

R1 components’ details

Using Directions

1. Insert the pump barrel into the oil container until it touches the bottom. Push the universal stopper down into the container opening. A snug fit is important as that enables the rubber stopper to stabilize the pump and keep out contamination.
2.Connect either copper tube or suitable hose to the ¼˝ flare fitting at the top of the pump and attach the other end loosely to the valve on the system. Then purge air from the hose and tighten the fitting at the system.
3.Open the compressor valve and start pumping the oil into the compressor with slow, even strokes, pushing straight down on the pump. Use other hand to steady container and pump by holding the neck of the pump where it meets the container opening.
4. After the required amount of oil has been pumped into the compressor, close the valve and remove the connecting line from the system. Also, cap the flare connection on the pump to help keep it clean and free of contamination for the next job.

 

R2 components’ details

Using Directions

1. Insert the inlet copper pipe into the oil container until it touches the bottom. 
2. Connect either copper tube or suitable hose to the ¼˝ flare fitting at the top of the pump and attach the other end loosely to the valve on the system. Then purge air from the hose and tighten the fitting at the system.
3.Open the compressor valve and start pumping the oil into the compressor with slow, even strokes, pushing straight down on the pump. Use other hand to steady container and pump by holding the neck of the pump where it meets the container opening.
4. After the required amount of oil has been pumped into the compressor, close the valve and remove the connecting line from the system. Also, cap the flare connection on the pump to help keep it clean and free of contamination for the next job.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Download

SHIPPING

Delivery Options:

Delivery Method
Incoterms Term
Applicable Countries
LCL, FCL by sea
EXW, FOB, CFR, CIF
General for all countries.
Air courier to door
DDU, DDP
General for all countries.
Air cargo to airport
CIF
General for all countries.
Door to door by road
DDP
Cambodia, Laos, Myanmar, Thailand, Vietnam. (keep expanding to more countries)
Door to door by seaDDU, DDPCambodia, Indonesia, Malaysia, New Zealand, Philippines, Singapore, Thailand, United Arab Emirates, United Kingdom, United States.   (keep expanding to more countries)
LCL=Less than Container Load.     FCL =Full Container Load
DDU = Delivery Duty Unpaid        DDP = Delivery Duty Paid
The above shipping information is general, and changing from time to time. Confirmation with us is necessary for each order.

Guangzhou tofee China one-stop hvac supplier

 

PAYMENT

Payment Options:
  • T/T (Telegraphic Transfer)
  • L/C (Letter of Credit)
  • Western Union
  • Alibaba Trade Assurance (Alipay)
PREV

FOLLOW US